View from the air
It’s time for our next aerial video, where you can see our project progress from the air. Click below to view.
00.00 Cowlairs (North West corner of the site): New road linking Keppochhill Road to Springburn Rd, provision of associated utilities / installation of street lighting, landscaping, planting / tree planting. New church (by others) and temporary church accommodation.
00.40 Cowlairs continued: Tie-in of the new rail overbridge (by others) to the existing and new road network; road and junction improvements to Keppochhill Drive; landscaping and tree planting
00.50 Western Boundary: Heading South down the western boundary of the site over the SUDs (Sustainable Urban Drainage) system, landscaping tree storage and planting
1.05 Shrub planting underway on parkland terraces
1.30 Pinkston basin – South West corner of the site
Bottom left – civic square location
Top right – canal terrace location
West – Stored soil in Hill Circus
1.40 Top right – SUDs system – Street canal structure
Top left – Paving works to civic Boulevard
1.50 Hill Circus – east and standing stones repositioned (1.55)
2.05 Bottom left excavation – tie-in of plot drainage to Scottish Water system
2.10 Site office complex and material storage yards
2.45 Formation of new road layout – route of civic boulevard (North-South) across site leading to civic square and hill circus, kerbing, installation of utilities, tree cells
3.05 Overall view of site from North to South, including campus (by others); site in relation to Glasgow city centre